254 Tan
The 254 Tan buildout at the Creekview development was delivered as a turnkey design-build finish-out. The project transformed the interior into a polished, client-ready space through close coordination of design and construction, ensuring efficiency, quality, and schedule control from concept through completion.
Estes Enterprise Offices
The Estes Enterprise Offices project consisted of a comprehensive finish-out within an existing pre-engineered metal building. The scope included exterior façade upgrades, polished concrete flooring throughout the interior, and the buildout of a 7,500-square-foot air-conditioned showroom and offices, resulting in a modern, functional space tailored to the client’s operational and display needs.
Allen Family Vet (Phase I)
The Allen Family Vet Phase I project involved a complete reconfiguration of the building’s front layout to enhance functionality and patient flow. The renovation delivered five new exam rooms, a fully ADA-compliant restroom, and a modernized reception lobby, all while allowing the clinic to remain fully operational throughout construction. Careful phasing and coordination ensured minimal disruption to staff and clients, resulting in a seamless upgrade to the facility’s clinical and public spaces.